EPC & Power Infrastructure
Construction & Installation Services
Building 33/11KV substations, laying 400KV underground cables, and installing 33KV overhead lines.
DCRP-certified jointers provide high-precision termination and jointing to ensure network reliabilit...
We install and upgrade lighting systems, including energy-efficient LEDs for roads and facilities.
Our Services
33/11kV Substations
- Full turnkey construction, installation, and commissioning.
- Transformer & switchgear installation.
- Civil works & steel structure erection.
Underground Cabling
- Expert cable laying up to 400kV levels.
- Trench excavation, sand bedding, and tile protection.
- Fiber optic cable installation & splicing.
33kV Overhead Lines
- Design, erection, and stringing of OHL.
- Pole installation and insulator replacement.
- Line maintenance and emergency repairs.
